A major construction and refurbishment programme at Southampton General Hospital has seen a number of key buildings given a fresh look.

LSC Facades has installed Trespa Meteon panels as part of a £6.3m redevelopment project which required a durable facade solution which would be easy to clean and would perform exceptionally well outdoors.

The project provides the Trust with an additional loading bay area, laboratory space on two levels above including a new mass spectrometer lab, and future space on an additional upper level, which will remain as a shell at this time. The trust secured additional funding which increased the height of the building to include additional floors, with an increased level of fit out works.